Site map
Contacts
Archive
Azərbaycan
versiyası






Top News

19.08.2016 12:07

Over 700 pipes delivered to Greece for TAPs construction

The Trans Adriatic Pipeline (TAP) Consortium said Aug. 18 that more than 700 pipes have been additionally delivered to Greeces Alexandroupolis for construction of the Trans Adriatic Pipeline.

In total, about 45,000 pipes will be used in the TAPs construction.

TAP project envisages transportation of gas from Azerbaijans Shah Deniz field to the EU.

The 870-kilometer pipeline will be connected to the Trans Anatolian Pipeline (TANAP) on the Turkish-Greek border, run through Greece, Albania and the Adriatic Sea, before coming ashore in Italy's south.

Initial capacity of TAP will be 10 billion cubic meters of gas per year.

all news





JOIN US!
Top news
TRAVEL PARTNER
Premier Tour
OFFICIAL HOTELS
Qafqazpoint


SheratonBaku
EXCHANGE RATES
  30/11/2021 01/12/2021
USD 1.7 1.7
EUR 1.8968 1.8968
GBP 2.1937 2.1937
RUR 0.0264 0.0264
WEATHER



      Caspian Oil & Gas Conference is Copyright © 2000-2021 All rights reserved. Hosted by VebTek